RMC plant ka flow
- Raw material bins
- Batching & mixing
- Transit mixer
- Site pe delivery
- Quality & reports
BUILT FOR READY-MIX CONCRETE PLANTS
Precision in every pour
Mix designs, batching, transit mixer dockets, silo stock and GST billing — in one place. Load 7.5 m³, return 0.5 m³, and the bill is for exactly 7 m³ while the full batch leaves your silos.
From silo to site, one set of books
THE QUESTION EVERY RMC OWNER ASKS
Concrete coming back from site is normal. CrusherOS records the returned part on the docket and takes it off the bill — but the silos still show the whole batch consumed, because all of it really was mixed.
Integers only: quantities are held as millicum (m³ × 1000) and recipes as grams per m³, so a batch never drifts by rounding.
Taken from the silos (all 7.5 m³)
7 m³ × ₹4,800 = ₹33,600 + GST
MIX DESIGN
M20, M25, M30 — grade ek baar daaliye, phir har docket wahi recipe follow karta hai.
Ingredients are stored in grams per cubic metre, so a 7.5 m³ load consumes exactly what the lab decided. Change the recipe and only the dockets after that change use it — the old ones keep the mix they were actually made with.
Customer · site · grade · slump · batch reference
Dockets chunye, ek invoice · GST ready
GSTR-1 · e-invoice IRN · e-way bill · TDS/TCS
| Crusher plant | RMC plant | |
|---|---|---|
| Bikta hai | Tonne me, weighbridge se | Cubic metre me, docket se |
| Gate ka kaagaz | Weighment slip | Concrete docket |
| Stock kya ghata | Aggregate dispatch hua | Cement, fly ash, sand, aggregate, admixture |
| Proof | Weights, photos, ANPR | Mix design, batch reference, slump, returned concrete |
| Billing | Per trip ya mahine ka ek bill | Mahine ke dockets ka ek bill |
We set your plant up with you — your grades, your ingredients, your transit mixers. Recipes and books are ready before you post the first docket.
No. The docket records what went out and what came back. The bill covers only what stayed on site — but the silos still show the whole batch consumed, because all of it really was mixed.
Not yet — today the docket is typed, or imported from the batching report. We wire the controller per plant, so tell us its make and model and we will connect it.
We set the plant up as “crusher and RMC together”. Both modules run under one login, and a single bill can carry tonnes and cubic metres side by side.
Tax invoice or bill of supply, CGST/SGST or IGST by place of supply, an HSN code on every line, and a GSTR-1 working Excel your accountant can file directly.